Fastest way to update 120 Million records

The only sane way to update a table of 120M records is with a SELECT statement that populates a second table. You have to take care when doing this. Instructions below.


Simple Case

For a table w/out a clustered index, during a time w/out concurrent DML:

  • SELECT *, new_col = 1 INTO clone.BaseTable FROM dbo.BaseTable
  • recreate indexes, constraints, etc on new table
  • switch old and new w/ ALTER SCHEMA … TRANSFER.
  • drop old table

If you can’t create a clone schema, a different table name in the same schema will do. Remember to rename all your constraints and triggers (if applicable) after the switch.


Non-simple Case

First, recreate your BaseTable with the same name under a different schema, eg clone.BaseTable. Using a separate schema will simplify the rename process later.

  • Include the clustered index, if applicable. Remember that primary keys and unique constraints may be clustered, but not necessarily so.
  • Include identity columns and computed columns, if applicable.
  • Include your new INT column, wherever it belongs.
  • Do not include any of the following:
    • triggers
    • foreign key constraints
    • non-clustered indexes/primary keys/unique constraints
    • check constraints or default constraints. Defaults don’t make much of difference, but we’re trying to keep
      things minimal.

Then, test your insert w/ 1000 rows:

-- assuming an IDENTITY column in BaseTable
SET IDENTITY_INSERT clone.BaseTable ON
GO
INSERT clone.BaseTable WITH (TABLOCK) (Col1, Col2, Col3)
SELECT TOP 1000 Col1, Col2, Col3 = -1
FROM dbo.BaseTable
GO
SET IDENTITY_INSERT clone.BaseTable OFF

Examine the results. If everything appears in order:

  • truncate the clone table
  • make sure the database in in bulk-logged or simple recovery model
  • perform the full insert.

This will take a while, but not nearly as long as an update. Once it completes, check the data in the clone table to make sure it everything is correct.

Then, recreate all non-clustered primary keys/unique constraints/indexes and foreign key constraints (in that order). Recreate default and check constraints, if applicable. Recreate all triggers. Recreate each constraint, index or trigger in a separate batch. eg:

ALTER TABLE clone.BaseTable ADD CONSTRAINT UQ_BaseTable UNIQUE (Col2)
GO
-- next constraint/index/trigger definition here

Finally, move dbo.BaseTable to a backup schema and clone.BaseTable to the dbo schema (or wherever your table is supposed to live).

-- -- perform first true-up operation here, if necessary
-- EXEC clone.BaseTable_TrueUp
-- GO
-- -- create a backup schema, if necessary
-- CREATE SCHEMA backup_20100914
-- GO
BEGIN TRY
  BEGIN TRANSACTION
  ALTER SCHEMA backup_20100914 TRANSFER dbo.BaseTable
  -- -- perform second true-up operation here, if necessary
  -- EXEC clone.BaseTable_TrueUp
  ALTER SCHEMA dbo TRANSFER clone.BaseTable
  COMMIT TRANSACTION
END TRY
BEGIN CATCH
  SELECT ERROR_MESSAGE() -- add more info here if necessary
  ROLLBACK TRANSACTION
END CATCH
GO

If you need to free-up disk space, you may drop your original table at this time, though it may be prudent to keep it around a while longer.

Needless to say, this is ideally an offline operation. If you have people modifying data while you perform this operation, you will have to perform a true-up operation with the schema switch. I recommend creating a trigger on dbo.BaseTable to log all DML to a separate table. Enable this trigger before you start the insert. Then in the same transaction that you perform the schema transfer, use the log table to perform a true-up. Test this first on a subset of the data! Deltas are easy to screw up.

Leave a Comment